The station
was visited on November 2, 2023. During this period all components were still
found to be in good condition. However, the sacrificial anode on the frame was
replaced during this inspection. The anchoring systems were still in good condition
with butterfly clips still securely fastened. All components were cleared of macroalgae. The mooring lines assemblages were also inspected and found to be in adequate condition.