There was a marked period between visits to the station due to holidays and poor weather conditions. On return to the station, there was significant macroalgae growth that was subsequently cleared. Biofouling organisms also had to be removed. The sacrificial anode on the cage also had to be replaced once more during this visit.
The anti-fouling
paint on the station, as well as on the other components, has almost completely been
removed. The system will therefore likely need to be repainted within the upcoming
months to ensure the longevity of the station.
There was
one meteorological sensor which had become loose on the station. It was then properly
reinstalled on the structure once this issue was identified.
The
anchoring systems were still in good condition with butterfly clips still securely
fastened. The mooring lines also remained in good condition.