The station was visited on July 19, 2023. During this period all components were working effectively. The anchoring systems were still in good condition with butterfly clips still securely fastened. All components were cleared of macroalgae and mooring lines remained in good condition.
This site is for recording maintenance records of the Coral Reef Early Warning (CREWS) station that was purchased by the Caribbean Community Climate Change Centre (CCCCC or 5Cs) and installed by the Saba Conservation Foundation for the Barbados Coastal Zone Management Unit (BCZM). Please update this blog whenever new operations are performed in the field, so that CREWS personnel can coordinate data management efforts with the Barbados BCZM field efforts.
Wednesday, July 19, 2023
Wednesday, July 5, 2023
In accordance with the maintenance schedule suggested by the CCCCC, the CREWS station was visited approximately two weeks post-installation on May 31, 2023 and again on June 29, 2023 to assess its condition. The state of the various components are outlined below.
Condition of CREWS Station Components
Reports had been
received that the beacon was not functioning days after the station’s
installation. On the first visit, efforts were made to reprogram the beacon.
The required codes were entered to test the battery health and reset the beacon
to its previous settings. However, it was reported once more that the beacon
still remained unlit at night. On contacting the CCCCC technician, it was
suggested that the beacon be completely uninstalled from the station and
properly assessed prior to its reinstallation. The beacon was uninstalled on
June 29, 2023. Once retrieved, the battery was changed, charged and the new
flashing code programmed. It was then verified that the beacon was being
activated on dim light conditions before being reinstalled on the station on July 5, 2023.
The above-water
components of the station were wiped with a cloth and freshwater. One of the
bolts connecting the solar panel to the station was noticeably missing. It was
reattached to the frame utilising a cable tie (Figure 1). Other than this
failure, all other bolts and sensors were in good condition.
Figure 1: Cable tie used to reattach the solar
panel
Shackles on the mooring lines were in goood condition beyond
a thin coating of algae (Figure 2). The butterfly clips holding the bolts on
the anchors were also in good condition.
Figure 2: Bolts at the southern U-anchor
The Seabird water
quality monitoring equipment was cleaned and cables remained securely fastened.
Some of the butterfly clips on the cage were seen to be straitening on the
first visit. This was corrected on the second visit in June. The
sacrificial anode will likely need to be replaced soon.
Figure 3: Degrading sacrificial anode.
Monday, May 8, 2023
The CREWS station was finally installed and became operational on March 8, 2023. It is an anchored buoy located near Dottin's Reef off the southwest coast of Barbados not far from Holetown. It was purchased by the Caribbean Community Climate Change Centre (CCCCC or 5Cs) for the Barbados Coastal Zone Management Unit.
We are informally referring to the buoy as DRBB2 (Dottin's Reef, Barbados, the 2nd CREWS station) although the National Weather Service in the US will also likely be giving it an all-numeric buoy designation.The coordinates of the CREWS station location are:
N 13° 11.018'
W 59° 38.77'
Launching, towing and installation of CREWS at Dottin’s Reef
Checking of Cured Anchors Installation of Mooring Rigs
The installation of the mooring lines went without any problems. However, the ceasing wire to secure the shackle pins was deemed not appropriate and it was decided to use a different kind during the next dive. Surface buoys were attached to the rigs to keep the chains of the ground and to be easily retrievable at the time of the actual deployment of the CREWS buoy.As on the previous dive days, upon return to the marina, the SCF crew was dropped in St. James, where all equipment was rinsed and prepared for the next deployment. The underwater footage was transferred to hard drives and batteries charged for the next day.
Friday, May 5, 2023
Assembly of Mooring Rigs Curing of anchor pin
Thursday, May 4, 2023
Installation of Anchor Pin Structural Enforcement of U-anchor
Wednesday, May 3, 2023
Assessment of Mooring Site Anchor Stress Test
them to Port Louis, the starting location for the dive trip to Dottin’s reef. There they were met by three officers of the Folkstone Marine Park. The marina was chosen, because from there it was easiest to load heavy dive equipment, tools and materials onto the boats. Because of the larger group, including six divers, two boats, the 17’ Boston Whaler of the marine park and an additional 21’ pirogue, a fishing vessel, were necessary to conduct the work. The pirogue was captained by a local fisherman. Travel time to Dottin’s reef by boat was approximately 15 minutes.
a) Locate the North- and South U-anchors,b) Confirm depth and GPS coordinates of each anchor,c) Measure the exact distance and cardinal orientation of the anchors in relation to each other,d) Evaluate the condition and suitability to the task of each U-anchor,e) Clean the anchors from marine growth and corrosionf) Perform a stress test to confirm the integrity of the north anchor,g) Scout for potential alternative anchor installation sites.
Dive teams and specific tasks for each diver were assigned, as well as relevant safety procedures reiterated. Because of the well qualified dive team and good coordination, only one, instead of the planned two dives was necessary to accomplish all objectives.
The South U-Anchor proved to be in perfect condition, as already reported in the report by Renata Goodridge. The Folkestone marine park rangers had already cleaned the anchors and there was very little sign of corrosion on the stainless-steel anchors.
Nonetheless, the North U-Anchor was found bent significantly, although it had not moved at all and seemed solidly secured in the bottom substrate. The stress test on the anchor at approximately 2,500 rpm by 2 x 150 hp Yamaha outboard engines showed that it was still very stable and the marine park vessel was not able to bend the U-anchor any further. Hence, there is a high probability that a large vessel had previously tied to it previously, exerting a large force on the system, without damaging it. The continuous force of that vessel had to be much larger than the CREWS buoy could ever pull with, even in harshest conditions. However, a crack seems to have developed between the two embedded anchor pins and some
The stress test on the anchor at approximately 2,500 rpm by 2 x 150 hp Yamaha outboard engines showed that it was still very stable and the marine park vessel was not able to bend the U-anchor any further. Hence, there is a high probability that a large vessel had previously tied to it previously, exerting a large force on the system, without damaging it. The continuous force of that vessel had to be much larger than the CREWS buoy could ever pull with, even in harshest conditions. However, a crack seems to have developed between the two embedded anchor pins and some play could be felt in the upper bore holes when attempting to wriggle the anchor. Hence, it was decided to fortify the existing U-anchor by chiseling the crack deeper and fill it with special two-component “Liquid Rock” epoxy. Additionally, a new drilling spot would be scouted the next day to install a backup single-eyed anchor.
Upon return to the marina, the SCF crew was dropped in St. James, where all equipment was rinsed and prepared for the next day. The underwater footage was transferred to hard drives and batteries charged for the next day.
Tuesday, May 2, 2023
Introductory meeting with Barbados Coastal Zone Management Unit (CZMU) and Coast Guard
Tools were inspected and discussions took place on how to move the buoy. Specifically, the travel lift posed some challenges, because the usual straps would need to be replaced by smaller ones. Instead of four, the buoy only has 3 attachment points. Hence, adjustment needed to be made to keep the buoy balanced and prevent it to tip to either size, potentially causing damage to the sensor arrays. Mr. Jones stayed to continue assembly of the instruments on the buoy, and returned later that day and next to continue the work.